Autoclave aerated concrete ploduction line technical process

1. First,dose and match stored raw materials

2. After distributing,feed raw material into pouring mixer to make slurry

3. Through thoroughly mixing,pour the slurry to mould

4. After pre-cutting under a certain temperture for a period of time,the block would reach a certain hardness prepare for cutting

5. Tilting hoister would turn over 90 degree of mould

6. Then open the mould and separate it from block,and take the block with side plate to cutting cart

7. First, two vertical sides of block are cut

8 .Secondly the horizontal cutting

9. Finally the vertical cutting

10. After cutting,the block is hanged to autoclave cart with side plate by semi finished hoister

11. Organizing the cut blocks and put them into autoclave

12. Hardening the blocks under certain temperture and pressure

13. Take finished products out of autoclave

14. The finished product hoister take the finished product to stock shield

15. Packed for loading

16. The side plate return back by side plate roller

17. Side plate would be organized with open mould

18. Clean the mould and preparing for next pouring

19. Steel bars processing line for slab production   Want to see the video, please click here

CHANGZHOU DINGCO INTERNATIONAL TRADE CO.,LTD.

CREDIBILITY   PROFESSIONAL   QUALITY SERVICE

 

 

 

Autoclaved Aerated Concrete Production Line

Production Engineering

Treatment and Storage of Raw Materials

Materials Matching, Mixing and Pouring

The Resting, Cutting and Grouping

Autoclaving and Finished Product

Waste Slurry Treatment

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Copyright©2006 dingco.com All Rights Reserved
ËÕICP±¸05044375ºÅ
Tel: 0086-519-85036162,85036762 Fax: 0086-519-85037016,85037026 E-mail: dingco@dingco.com